Board template · Manufacturing

The product development process, from engineering to production.

Each project becomes a card. The lists run from Engineering to Release to Production, and each stage arrives with its checklist.

Development · 2027

The lists and the checklists

Each list is a stage. The first card in each list shows the stage's checklist; the others are just examples.

01Engineering

VX-40 Valve
  • 3D drawing
  • Specification
  • Bill of materials
Project 0002
Project 0003

02Sample

Project 0001
  • Machining
  • Assembly
  • Bench test
Project 0004

03Qualification

Project 0001
  • Pressure test
  • Test report

04Tooling

Project 0001
  • Molds
  • Fixtures
  • Machine setup
Project 0005

05Pilot Batch

Project 0001
  • First article
  • Dimensional inspection

06Release to Production

Project 0001
  • Control plan
  • Work instruction
  • Packaging sheet

The Triggers that take the next step

Two rules per stage, created by an administrator in Settings › Workspace · Automation › Triggers. Each Trigger applies to one board.

On entering the list

Event Card moved (on the first list, Card created), condition List is the stage, action Create checklist with the items.

With the checklist complete

Event Checklist item checked/unchecked, conditions List is the stage and Checklist progress all items done, action Move to list. On the last stage, Change card status to Closed.

StageOn entering the listWith the checklist complete
EngineeringCreate checklist: 3D drawing, Specification, Bill of materialsMove to list: Sample
SampleCreate checklist: Machining, Assembly, Bench testMove to list: Qualification
QualificationCreate checklist: Pressure test, Test reportMove to list: Tooling
ToolingCreate checklist: Molds, Fixtures, Machine setupMove to list: Pilot Batch
Pilot BatchCreate checklist: First article, Dimensional inspectionMove to list: Release to Production
Release to ProductionCreate checklist: Control plan, Work instruction, Packaging sheetChange card status: Closed

Before switching each rule on, use Test trigger on a real card: Colin shows what it would do without changing anything on the card.

How to build it in your trial

  1. Start the trial and create the board Development · 2027.
  2. Create the lists in this order: Engineering, Sample, Qualification, Tooling, Pilot Batch, Release to Production.
  3. In Settings › Workspace · Automation › Triggers, create the rules in the table and check each one with Test trigger.
  4. Create the first card in Engineering. The stage's checklist arrives by itself.

Colin doesn't import templates. Each page shows what to create, list by list, and the board is yours to change however you like.

See also

Boards and cards

Boards with your process's lists and cards with an owner, a deadline, a checklist and the conversation.

Workflow automation

When, if and then rules that move cards, call people in and tell other systems, on their own.

All templates

The ten processes, each with its lists and Triggers.

Frequently asked questions

Can I import this template ready-made?

No. Colin doesn't import templates: you build the board following this page. The lists and checklists are yours, and you change whatever you like afterwards.

Who can create the Triggers?

The company's administrators, in Settings › Workspace · Automation › Triggers. Each Trigger applies to one board.

Can I change the lists and checklists?

Yes. The template is a starting point: rename, remove or add lists and items, and adjust the Triggers to match.