Boards and cards
Build boards with the stages of your process and follow each task on a card with an owner, members, a deadline, a checklist and comments. The statuses are yours, and finished work drops to the bottom of the list.
· 6 min read
Setting up the board takes ten minutes. Getting the team to keep using it after the first week is the hard part, and it nearly always comes down to three or four agreements nobody writes down.
The short answer
To set up a kanban board, list the stages your work really goes through and make a column for each one, from intake to done. Each task becomes a card with an owner and a deadline, and it moves from left to right as the work progresses.
Then agree with the team on what it means for a card to enter each column, how many tasks can be in progress at once and who keeps the board up to date. Without those agreements, the board looks great on day one and is out of date by day ten.
Kanban is a way of seeing the work. Each task is a card, each stage is a column, and the card moves through the columns until it's done. The idea came from Toyota's factories, where a physical card signalled that it was time to make one more part, and it reached offices as a board on the wall covered in sticky notes.
What the board gives you is a quick answer to "how's it going?". You look and see what's stuck, what's moving and where tasks are piling up. Nobody has to ask each person.
The most common mistake is to copy "To do, Doing, Done" and stop there. It's fine to start with, but it hides exactly what you want to see. If every task in progress sits in "Doing", you can't tell whether it's in production, waiting for the client's approval or stuck with a supplier.
Take a typical task and walk through its path out loud. In a clothing workshop, a piece of the collection goes through research, development, approval and production. In an agency, a job goes from brief to creation, internal review, client approval and delivery. Every stop where someone else takes over, or where it depends on someone outside, deserves a column.
Two rules help you not overdo it:
A good card answers four questions without anyone opening it: what it is, who's responsible, when it's due and how much is done. So the minimum is a title that describes the deliverable, an owner, a deadline and, when the task has steps, a checklist.
The title matters more than it seems. "Linen shirt" says little. "Pattern for the linen shirt" says which deliverable the card stands for and when it can leave the column.
One owner per card. Other people can work on it, but one person answers for it. A card with two owners, in practice, has none.
This is where most boards die. Write these agreements on the board itself or in its description, and review them after a month.
One sentence per column: "it enters Approval when the sample is ready and photographed". That ends the card that moves too early and goes back two columns the next day.
That's the WIP limit, for work in progress. If the Development column takes at most five cards, the team finishes something before starting something else. It sounds like red tape, but it's what cuts delivery time the most, because a task that's started and stalled delivers nothing. Start with a generous number, a little above what the column holds today, and tighten it slowly.
Agree on what has to be finished for the card to reach the last column. Approved by the client? Delivered? Invoiced? If everyone means something different, the board lies.
Everyone moves their own cards, at the moment things happen. If updating waits for Friday's meeting, the board is wrong all week and people go back to the group chat.
A short conversation in front of the board, once or twice a week, is worth more than a report. Read it from right to left: what's nearly done and what it needs to get out. Then look for the column that's filling up. That's the bottleneck, and that's where the team needs help, not more new tasks.
A card that has sat in the same column for a long time is worth talking about too. Either it's blocked by something nobody mentioned, or it stopped mattering and can be archived.
Scrum organises work in closed cycles, sprints, with a batch of tasks chosen at the start of each one. Kanban has no cycles: a task comes in when there's room and leaves when it's ready. Software teams tend to use scrum when they can plan two weeks ahead without many interruptions.
For teams that receive work all the time, like an agency, a workshop, customer service or finance, kanban usually fits better. And nothing stops you from using a kanban board inside a sprint, which is exactly what many scrum teams do.
In Colin Workspace, you create the board from the side menu and name the lists, one per stage. Each task is a card with an owner, members, labels, priority, start and due dates, a checklist and comments that mention colleagues. The card shows the deadline and how many checklist items are done without opening it.
The agreements from step 3 have a place in the tool. You create your team's statuses and mark which ones finish the work, so "done" means the same thing for everyone. Each status can have a card limit per list, and when it's exceeded the list shows a warning, without stopping anyone from moving a card. A list can also give a status to the card that enters it. Completed cards drop to the bottom of the list, and Hide completed takes them out of view.
Every change goes into the card's history, with who made it and when. And the same board opens as a list, a Gantt chart, a timeline and a calendar, for whoever prefers to see the dates.
The screens and the step by step are on the page about Colin's online kanban board.
Build boards with the stages of your process and follow each task on a card with an owner, members, a deadline, a checklist and comments. The statuses are yours, and finished work drops to the bottom of the list.
Register a card, pick the apps and how many seats you want, and nothing is charged until the trial ends. Or we'll show you Colin with your company's boards and pipeline in 30 minutes.